Technical specs
permission process
Building ground, the type of land other areas. The land ground plan has been approved that appoints its industrial usage, ground plan resolution has been issued concerning road-traffic infrastructure, engineering network and logistics/storage objects. Building permission has been approved for engineering network.
ENGINEERING NETWORKS AND THEIR CAPACITIES |
|
Electric power | |
Max. reserve cap. accord. to the contract | 28 000 kW |
Gas | |
Average annual consumption | 14 243 150 m3/year |
Drinkable water | |
Daily consumption of supply water Qp | 330 m3/day 3,83 l/s |
Max. daily consumption of water Qm | 533 m3/day 6,19 l/s |
Max. hourly consumption of water Qh | 960 m3/hour 11,10 l/s |
Annual consumption of water | 99 000 m3/year |
Public sewage system | |
Existing sewage to which we connect is DN 400 | 130 l/s |
Param. of public pumping station are: | |
Q planned Qn | 1232 l/s |
Q pumped Qč | 1244 l/s |